Commercial exteriors with zero downtime.
Most commercial exteriors can't shut down for paint. We phase the work — building by building, elevation by elevation, after-hours where needed — so guests, residents, and staff barely notice.
Lift-equipped crews handle multi-story work. Lead painter on every job. Project manager assigned to your account from estimate through warranty.
Coastal SC commercial work means premium acrylics on stucco, EIFS, and Hardie. We carry product warranties from Sherwin-Williams and PPG and apply within manufacturer spec on every job.
What's Included
- On-site survey, written scope, phased schedule
- Lift and scaffold equipment as needed
- Pressure wash, mildew treatment
- Carpentry, EIFS and stucco patching
- Two finish coats premium commercial-grade acrylic
- Re-stripe and signage protection
- Daily safety walk, clean job site at all times
- Manufacturer + 3-year workmanship warranty
From first call to final walk-through.
Survey
Walk the property with operations and maintenance. Identify scope, access, and timing constraints.
Scope & Schedule
Written scope, phased schedule, single point of contact, mobilization plan.
Mobilization
Lifts staged, materials stocked, signage and landscaping protected.
Wash & Prep
Building-by-building wash, mildew treatment, EIFS/stucco patching.
Paint
Two coats, sprayed-and-back-rolled where appropriate. Daily progress photos to your project manager.
Walk & Warranty
Property walk with ownership; warranty paperwork in your inbox same day.
Before you call — read the guide.
The guides our own crew sends customers during the estimate process. Real pricing, real diagnosis, no fluff.
Exterior Commercial Painting — from our blog.
Commercial Exterior Painting — How We Minimize Business Downtime
Phased scheduling, night shifts, and staging that keeps your storefront open while we paint around it.
Read post →
HOA-Approved Color Palettes for South Carolina Commercial Properties
Palmetto Dunes, Sea Pines, Palmetto Bluff, Wexford — navigating coastal HOA color review without delaying your project.
Read post →
When a Commercial Repaint Actually Pays for Itself
The ROI math on exterior commercial painting — asset preservation, perceived value, and the hidden cost of waiting.
Read post →Can you work after hours?
Yes. Most retail and hospitality work happens evenings and weekends to avoid disrupting operations. Multi-family work runs daytime when residents are at work.
Do you do multi-story work?
Yes — lift-equipped crews handle most multi-story commercial. We coordinate scaffolding and OSHA-compliant fall protection on anything taller.
How quickly can you mobilize?
Most projects start within 2–4 weeks of contract signing. Emergency or warranty work moves faster.
What about stucco and EIFS?
We patch and repaint both. Larger EIFS damage we coordinate with a specialty sub if needed.
What documentation do you provide for commercial work?
Whatever your property team needs to onboard a vendor — ask at the walkthrough and we will go over it together. Bring the same question to every contractor you are comparing.
Free estimate for your exterior commercial painting project.
Tell us a little about the job. We'll be back in touch within hours, not days.